Culvert construction on the causeway
Administrator | Aug 26, 2013 | Comments 0
A culvert on the causeway at the west end of Prince Edward Road 28 being replaced. While working on the site they are using giant water-filled bags to keep the water from Saugeen Marsh from flowing into the work site. The section of road is to be closed until the job is complete at the end of September. Photos show the waterbag on the north side of the road and the Marsh being held back by the water bag on the south side. John Ferguson photos
Filed Under: Local News
About the Author: