All County, All the Time Since 2010 MAKE THIS YOUR PRINCE EDWARD COUNTY HOME...PAGE!  Saturday, July 27th, 2024

June 10-11 closure intended to open Skyway Bridge to two lanes of traffic

 

 

UPDATE MAY 30: The closure scheduled for  Thursday, June 6 to Friday, June 7 has been cancelled due to expected poor weather conditions.

It  has been rescheduled to take place from 9 p.m.  Monday, June 10 to 6 a.m.  Tuesday,
June 11.

The closure is intended to open bridge to two lanes of traffic.

 

During these time periods the highway will be closed, and no traffic will be permitted to pass over the bridge.

The bridge is an 850m long, high-level bridge carrying two lanes of Highway 49 traffic over the Bay of Quinte. The bridge was constructed circa 1967 and was in need of major repairs. The work included the complete replacement of the steel girders and deck, rehabilitation of the piers, and reconstruction of the abutments. The bridge deck will be widened slightly and will include 1.5 m shoulders on each side.

Work began in 2018 with preparations for each segment of the bridge and was to be replaced over five years. It is expected to be opened in the summer of 2024.

 

Filed Under: COMING EVENTS

About the Author:

RSSComments (0)

Trackback URL

Comments are closed.

OPP reports
lottery winners
FIRE
SCHOOL
Elizabeth Crombie Janice-Lewandoski
Home Hardware Picton Sharon Armitage

HOME     LOCAL     MARKETPLACE     COMMUNITY     CONTACT US
© Copyright Prince Edward County News countylive.ca 2024 • All rights reserved.