Picton dump closed Aug. 24 for repairs
Administrator | Aug 22, 2022 | Comments 0
The Picton waste transfer site is to be closed Wednesday, Aug. 24 for repair work to the asphalt entrance
The site is to be re-opened for operation on Saturday, Aug. 27.
The following sites are to be open on Aug. 24 to offset the impacts of closing the Picton waste transfer site:
South Marysburgh Landfill (1132 Old Milford Road)
Hallowell Transfer Station (1080 Shannon Road)
Sophiasburgh Transfer Station (35 County Road 14)
Construction waste can be taken to either the Hallowell or Sophiasburgh landfills during this closure.
Filed Under: News from Everywhere Else
About the Author: