All County, All the Time Since 2010 MAKE THIS YOUR PRINCE EDWARD COUNTY HOME...PAGE!  Tuesday, November 17th, 2026

Sidewalk and culvert repairs at Wellington

The municipality plans sidewalk and culvert repairs over Lane Creek in Wellington from Monday, Nov. 23 to Friday, Dec. 4.

During this time, parking in front of 283 Wellington Main Street will be unavailable. Traffic will be diverted into the north parking lane during this work.

Work will to take place between 7 a.m. and 7 p.m. Monday to Friday.
Traffic control will be in place. Motorists are advised to drive with caution in the area or use alternate routes.

Heavy equipment will limit visibility in the area and noise levels will be elevated for the duration of the work.

For more information, contact the County of Prince Edward at 613.476.2148 ext. 1023, 613.962.9108 ext. 1023, or info@pecounty.on.ca

Filed Under: News from Everywhere Else

About the Author:

RSSComments (0)

Trackback URL

Leave a Reply

OPP reports
lottery winners
FIRE
SCHOOL

HOME     LOCAL     MARKETPLACE     COMMUNITY     CONTACT US
© Copyright Prince Edward County News countylive.ca 2026 • All rights reserved.