All County, All the Time Since 2010 MAKE THIS YOUR PRINCE EDWARD COUNTY HOME...PAGE!  Saturday, December 14th, 2024

Water works repairs Friday on Loyalist Parkway in Carrying Place

The County’s water and wastewater department will be working to repair a watermain leak on Highway 33, Loyalist Parkway, between Smokes Point Road and County Road 19 in Carrying Place.

Repairs will begin on Friday, March 24 at 9 am, with an expected completion time of 6 pm the same day.

Lane closures are not expected in the construction area; however, traffic control may be in place. Motorists are asked to follow all posted signage and signal-people directions.

Residents on Highway 33, Loyalist Parkway between Smokes Point Road and County Road 19 will experience an interruption to service, intermittent pressure fluctuations and coloured water while construction is taking place.

If coloured water is experienced, customers are encouraged to flush their water lines at the cold water tap nearest to the water meter once work is complete.

For more information, contact the County of Prince Edward at 613.476.2148 ext. 1023, 613.962.9108 ext. 1023, or info@pecounty.on.ca.

Filed Under: News from Everywhere Else

About the Author:

RSSComments (0)

Trackback URL

Comments are closed.

OPP reports
lottery winners
FIRE
SCHOOL
Elizabeth Crombie Janice-Lewandoski
Home Hardware Picton Sharon Armitage

HOME     LOCAL     MARKETPLACE     COMMUNITY     CONTACT US
© Copyright Prince Edward County News countylive.ca 2024 • All rights reserved.